What does F1 mean on a Glow-worm boiler?
Glow-worm’s published fault-finding tables for its CI, CXi and HXi ranges list F1 as “Ignition fault”. The boiler went through its start-up sequence but could not light the burner or prove the flame, so it locked out for safety.
Glow-worm’s homeowner guidance explains that on current boilers the equivalent codes are F28 and F29, and that this kind of fault usually relates to the gas supply, such as a pre-payment meter out of credit, or a condensate pipe that is frozen or blocked.
It matters which model you have, because Glow-worm codes changed over the years. Several websites wrongly describe Glow-worm F1 as low pressure; on these older ranges low pressure is F9, and on current boilers it is F22.
What causes an F1 ignition fault?
- Gas supply: a prepayment meter out of credit, the gas turned off, or low gas pressure.
- Condensate: a frozen or blocked condensate pipe or trap, very common on older condensing models in winter.
- Ignition components: a worn spark electrode, a faulty ignition lead or the spark generator.
- Flame detection: a dirty or failing flame sensing electrode.
- Gas valve or fan: a gas valve that will not open properly, or a fan or air pressure fault that stops ignition. Fan faults usually show as F2 instead.
What can you safely check yourself?
- Check the gas. Does the hob light? Top up a prepayment meter if needed.
- Check the condensate pipe outside and thaw it with warm, never boiling, water if frozen. See frozen condensate pipe.
- Note your model name from the front of the boiler or the data badge.
- Reset once following your user manual.
When should you get an engineer?
If F1 returns after one reset with the gas on and the condensate pipe clear, the problem is with ignition inside the boiler. Older Glow-worm boilers are now well past their first decade, so the engineer will also look at the overall condition. They will test the gas pressure, electrodes, leads, gas valve and condensate trap, and you will get a price, and honest repair-or-replace advice, before any work starts.